Steam Coil Air Pre Heaters

Steam Coil Air Pre Heaters

Steam Coil Air Pre Heater (SCAPH) is an extended surface type heat exchanger. This equipment is used to heat atmospheric air to the required process temperature by means of saturated steam. Steam flows inside the tube while air passes over the finned tubes .It is generally used for heating process air in Sugar Mills, Starch Mills, Chemical & allied Industries. SCAPH find extensive use with all types of High Capacity Boilers, Recovery Boilers, Dryers etc.

Steam coil air preheaters ( SCAPHS ) are used to heat air entering the air heater recuperative or regenerative type, in order to raise the average cold end temperature to prevent acid dew point corrosion. This type of equipment is normally incorporated into the design of a boiler unit for low load operation and startup operation particularly in those areas with low ambient air temperatures. They are desirable in that the main air heaters, recuperative or regenerative, have corrosion sections that are more readily maintained This type of air heater uses extended surface, normally referred to as fins, to reduce the overall size of this air preheater. It is generally located in the duct between the FD fan and the main air heater. iin those areas that have extremely low ambient air temperatures, it is  common to have this ahead of the FD fan that could preheat cold winter air up to about 40 degrees F.
Below sketch provide idea on the location of SCAPH in the process cycle of Boiler.

1. Simple in concept, complex in operation. A rough schematic of a typical steam coil air preheater. For simplicity’s sake, the system shown depicts single coils in walls and ducts. In an actual system, the steam supply and condensate return lines typically feed 6 to 40 coils per forced-draft fan. Source: Armstrong Heat Transfer Group

 


Heaters, Vacuum Cleaning System Back Heaters, Vacuum Cleaning System Print
 
Product Gallery
Features
  • Designed to perform well under critical conditions with great versatility.
  • Inspected and tested under rigid quality controlled standards.
  • Assures top performance and durability.
  • Highest quality materials used in construction.
  • Designed with latest computerized programs and manufactured using the most modern methods.
  • Guaranteed for 18 months for process performance and against poor workmanship.
Codes and Standards Followed
ASME SEC. II,V,VIII, IX, TEMA, IS, BS, HEI, API 661 etc.
Third Party Inspection
  • LLOYD`S
  • EIL
  • IBR
  • TATA
  • L&T
  • BVQI
  • PDIL
  • DNN etc.